It is an implied contractual term under Kenyan law that construction contractors are required to deliver works that meet the description and standard under the construction contract. Failure to do so, for example by using lower quality materials, constitutes defective work which is a breach of contract. The term for this period differs depending on the form of contract used, but is often referred to as the defects liability period ("DLP").